CVT Drive Pulley Pressure Control Solenoid Valve Test

NOTE: Keep all foreign particles out of the transmission.

2. SCS - Short

1.
Turn the vehicle to the OFF (LOCK) mode.

2.
Jump the SCS line with the HDS, and wait more than 1 minute.

3. CVT Drive Pulley Pressure Control Solenoid Valve - Internal Resistance Check


2.
Measure the CVT drive pulley pressure control solenoid valve resistance between the following test points 1 and 2.

Test point 1
Test point 2
Body ground

Standard: 5.0?6.3 ?
If the resistance is within the standard, then the test is complete, and install all removed parts.
If the resistance is out of the standard, then go to the next step, and check the CVT drive pulley pressure control solenoid valve operation.

4. CVT Drive Pulley Pressure Control Solenoid Valve - Operation Check




3.
Disconnect the connector (A).

4.
Connect a jumper wire from the positive battery terminal to connector (B) terminal No. 2, and connect another jumper wire from the negative battery terminal to connector terminal No. 1.

If a clicking sound is heard, repair the wire between the CVT drive pulley pressure control solenoid valve and the PCM.

5. All Removed Parts - Install

1.
Install the parts in the reverse order of removal.